Standard Operating Guide for Aluminum Formwork Installation


Author:

To ensure the safety and precision of the structure, aluminum formwork construction must follow these standardized steps:

 

Surveying & Setting Out: Project axis and control lines accurately; deviation should be within $2$mm.

 

Wall & Column Installation: Start from the corners using pins and wedges for physical connection, ensuring vertical alignment.

 

Beam & Slab Installation: Utilize the early stripping system. Once concrete reaches $50\%$ of its design strength, panels can be removed while retaining the support props.

 

Reinforcement Check: A "secondary reinforcement" inspection is mandatory before casting to ensure all walings and diagonal braces are secure.